Integrating Upstream Supply Chains into Generation Expansion Planning
By: Boyu Yao, Andrey Bernstein, Yury Dvorkin
Potential Business Impact:
Plans power plants considering factory limits.
Rising electricity demand underscores the need for secure and reliable generation expansion planning that accounts for upstream supply chain constraints. Traditional models often overlook limitations in materials, manufacturing capacity, lead times for deployment, and field availability, which can delay availability of planned resources and thus to threaten system reliability. This paper introduces a multi-stage supply chain-constrained generation expansion planning (SC-GEP) model that optimizes long-term investments while capturing material availability, production limits, spatial and temporal constraints, and material reuse from retired assets. A decomposition algorithm efficiently solves the resulting MILP. A Maryland case study shows that supply chain constraints shift technology choices, amplify deployment delays caused by lead times, and prompt earlier investment in shorter lead-time, low-material-intensity options. In the low-demand scenario, supply chain constraints raise investment costs by $1.2 billion. Under high demand, persistent generation and reserve shortfalls emerge, underscoring the need to integrate upstream constraints into long-term planning.
Similar Papers
Nodal Capacity Expansion Planning with Flexible Large-Scale Load Siting
Optimization and Control
Builds smarter power grids for big energy users.
On the Potential of Electrified Supply Chains to Provide Long Duration Demand Flexibility
Systems and Control
Shifts factory and truck power use for days.
Reverse Supply Chain Network Design of a Polyurethane Waste Upcycling System
Computational Engineering, Finance, and Science
Plans best way to recycle plastic into new things.